50.1 CONSTRUCTION EQUIPMENTThe Contractor shall without prejudice to his overall responsibility to execute and <strong>com</strong>plete thework as per specifications and time schedule, progressively deploy equipments and tools &tackles as and augment the same as decided by the Engineer-in-Charge depending on theexigencies of the work so as to <strong>com</strong>plete all works within the contracted time schedule andwithout any additional cost to Owner. No construction equipment shall be supplied by the Owner.50.2 MANPOWER DEPLOYMENT50.2.1 Bidder shall meet the requirement regarding deployment of minimum construction manpower asspecified in the bidding document at Appendix-VIII-A to SCC. Bidder shall also submit their<strong>com</strong>pliance for deployment of manpower along with the bid. Qualification and Experience of keyconstruction personnel shall be as per Appendix-IX to SCC.50.2.2 Schedule of Labour & Equipment RatesHiring / Recovery Rate for Deployment of Manpower attached as Appendix-X to SCC shall beused for analyzing rates for extra items and recovery for non- deployment of manpower.50.2.3 Equipment Hiring / Recovery Rates attached as Appendix-XI to SCC shall be used for analysingrates for extra items and recovery for non-deployment of equipment.50.3 MANPOWER & EQUIPMENT DEPLOYMENT CRITERIABidder shall <strong>com</strong>ply to deployment of minimum Construction Equipment and manpower (referAppendix – VIII A& B of SCC).Note :In case the Bidder quotes for Both the Parts, the Quantity of equipments mentioned shallbe cumulative of Part -I & Part –II.50.4 List of available Technical Manpower & Key Personnel intended to be deployed with theirCV’s (academic qualification, experience and fields of specialization.) as per AppendixVIII-A of SCC50.5 List of Construction Equipment & Machinery in line with Appendix VIII-B of SCC .51.0 MECHANISED CONSTRUCTION51.1 Contractor shall without prejudice to his overall responsibility to execute and <strong>com</strong>plete the workas per specifications and time schedule adopt as far as practicable, mechanized constructiontechniques for major site activities. Contractor agrees that he will deploy the required numbersand types of the plant & machinery applicable for different activities in consultation with theMH2145-C000-PS-RFQ-0020Page 141 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!