APPENDIX-IV TO SCCTERMS OF PAYMENTTERMS OF PAYMENTPending <strong>com</strong>pletion of the whole works, provisional progressive payments for the part ofwork executed by the contractor shall be made by Owner on the basis of said work<strong>com</strong>pleted and certified by the Owner's representative as per the agreed milestonepayment schedule and the percentage break-ups given below.Contractor shall submit his invoices to the Owner's representative fortnightly in themanner as instructed by Owner. Each invoice will be supported by documentationacceptable to Owner and certified by the Owner's representative. Payments made byowner to the contractor for any part of the work shall not deem that the Owner hasaccepted the work. All payments against running bills are advance against the work andshall not be taken as final acceptance of work / measurement carried out till the final bill.Owner will release payment through e-payments only as detailed in the biddingdocument.Payment will be made against Running Account bills for the work done on the basis ofaccepted unit rates as per contract in the following manner :-1.0 LAYING OF PIPELINE / INSTALLATIONA) 95% Payment will be made as below:-1.1 5% progressively on <strong>com</strong>pletion of site development, stacking, clearingand grading of ROU.1.2 10% progressively on <strong>com</strong>pletion of trenching by excavation.1.3 20% progressively on <strong>com</strong>pletion of stringing, fabrication, alignment,bending, field welding & NDT.1.4 20% progressively on <strong>com</strong>pletion of joint coating & lowering.1.5 5% progressively on <strong>com</strong>pletion of laying of OFC, jointing, back filling.1.6 5% on establishing OFC continuity between respective SVs.1.7 15% progressively on <strong>com</strong>pletion of Magnetic pigging, gauge platepigging, hydro testing, dewatering and swabbing.1.8 2% on finalization of material reconciliation.1.9 3% on submission of As-Built drawings & all other drawings / documentsas per CONTRACT.1.10 10% after <strong>com</strong>pletion of Pre-<strong>com</strong>missioning activities including integrationof the system.MH2145-C000-PS-RFQ-0020Page 179 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!