12.07.2015 Views

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

Pipelaying Tender-VOL I - WorleyParsons.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SlNo. ACTIVITY CONTRACTOR PMC21 Check for difference between actual laid length andscheduled length. If the difference found to be morethan 10% then the cable shall be referred back to PMCWCRwfor rechecking of voltage drop etc.PRE-COMMISSIONING TEST22 Check insulation resistance for the total run of cableincluding joints and end termination.(Attach report)WCRw23Check <strong>com</strong>plete continuity for each core in the cable forits entire length of run.WCS24 Perform phase rotation test WC SNote : Each test shall be made only if the cable hassuccessfully passed the preceeding test.All results to be recorded and attached with this.MH2145-C000-PS-RFQ-0020Page 193 of 334

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!