12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>3.02 DELIVERY AND STORAGEA. Deliver in original unopened packages and store in enclosed shelter; protect from damage andexposure to direct sunlight. Remove damaged or deteriorated materials from premises.3.03 BATT INSTALLATIONA. Install insulation in accordance with manufacturer's instructions.B. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids.C. Fit insulation tightly in cavities and tightly to exterior side of mechanical and electrical serviceswithin the plane of the insulation.3.04 BOARD INSTALLATIONA. Insulate interior face of exterior concrete foundation, including returns under floor slab asindicated on the drawings. Provide complete insulation membrane around entire buildingwhether specifically indicated or not.B. Mechanically fasten insulation boards to substrate at NRCA, UL or FM required spacing,whichever is more stringent.C. Apply insulation boards parallel to roof perimeter edges.D. Lay second layer of insulation with joints staggered from first layerE. Lay insulation boards with edges in moderate contact without forcing. Cut insulation to fit neatlyto perimeter blocking and around penetrations through roof.F. Apply no more insulation than can be sealed with membrane in same day.G. Keep insulation a minimum of 3 inches from heat emitting devices, and a minimum 2 inchesfrom sidewalls.H. Install after building embankment and granular cushion have been completed and vaporretarder is in place. Lay insulation in place, edges closely pressed together, against inside faceof foundation beam excavation; returned under floor slab as shown on the drawings. Pourconcrete to cover insulation.3.05 PROTECTION OF FINISHED WORKA. Do not permit installed insulation to be damaged prior to its concealment.3.06 CLEAN-UPA. Upon completion of work of this section, remove related debris from premises.END OF SECTION03/09/10 BOARD AND BATT INSULATION07212 -3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!