12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>PART 3 EXECUTION3.01 EXAMINATIONA. Do not begin installation until substrates have been properly prepared.B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactorypreparation before proceeding.3.02 PREPARATIONA. Take panels out of cartons and allow to acclimatize to room conditions for at least 48 hours priorto installation.B. Prepare surfaces using the methods recommended by the manufacturer for achieving the bestresult for the substrate under the project conditions.C. Clean surfaces thoroughly prior to installation.D. Protect existing surfaces from damage due to installation.3.03 INSTALLATIONA. Install in accordance with manufacturer's written instructions.B. Use the adhesives recommended by the panel manufacturer unless prohibited by localregulations; obtain manufacturer's approval of alternative adhesives.C. Install panels continuous from floor to ceiling without horizontal joints.D. Install continuous bead of silicone sealant in each joint and trim groove and between trim andadjacent construction, maintaining 1/8 inch expansion space.E. Avoid contamination of panel faces with adhesives, solvents, or cleaners; clean as necessaryand replace if not possible to repair to original condition.F. Protect installed products until completion of project.G. Touch-up, repair or replace damaged products after Substantial Completion.H. Cove base to be installed on top of FRP with no bottom trim. Caulk top of cove to FRP withclear silicone.END OF SECTION04-27-11 FIBERGLASS REINFORCED PLASTIC PANELS06605 -2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!