12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>3.04 FINAL CLEANINGA. Clean each surface or item as follows before requesting inspection for certification ofSubstantial Completion:1. Remove labels that are not permanent.2. Clean transparent materials, including mirrors. Remove excess glazing compounds.Replace chipped or broken glass.3. Clean exposed finishes to a dust-free condition, free of stains, films, and foreignsubstances. Leave concrete floors broom clean.4. Vacuum carpeted surfaces and clean quarry tile flooring & base.5. Clean according to tile & grout manufacturers’ specific recommendations.6. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication. Cleanplumbing fixtures. Clean light fixtures and lamps. Clean walk-in refrigeration units.7. Remove all construction debris, unused materials, etc. when project is turned over toOwner. Maintain the site in a clean condition during the course of construction. Sweeppaved areas; remove stains, spills, and foreign deposits. Rake grounds to a smooth, eventexturedsurface.3.05 PUNCH LISTA. At time of third Meeting (refer to Specification Section 01300) A copy of the Punch List will beprovided to the Contractor.3.06 CLOSEOUT PROCEDURESA. Request Substantial Completion inspection once the following are complete:1. Advise Owner of pending insurance changeover requirements.2. Submit Record Drawings and Specifications, maintenance manuals, warranties, andsimilar record information.3. Complete startup testing of systems and instruction of operation to Owner’s personnel.4. Remove temporary facilities and controls.5. Complete final cleanup.6. Complete Punch List Repairs.7. Obtain final inspections from authorities having jurisdiction.8. Obtain Certificate of Occupancy.9. Obtain Certificate of Capacity.10. Submit Consent of Surety to final payment.B. Arrange for each installer of equipment that requires operation and maintenance to provideinstruction to Owner's personnel. Include a detailed review of the following:1. Startup and shutdown.2. Emergency operations and safety procedures.3. Noise and vibration adjustments.4. Maintenance manuals.5. Spare parts, tools, and materials.6. Lubricants and fuels.7. Identification systems.8. Control sequences.9. Hazards.10. Warranties and bonds.C. Request inspection for certification of final acceptance, once the following are complete:1. Submit a copy of the Substantial Completion inspection list stating that each item has beencompleted or otherwise resolved for acceptance.04-27-11 EXECUTION REQUIREMENTS01700 -2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!