12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8. The Contractor shall properly protect all equipment from damage duringconstruction. Thoroughly clean all fixtures, equipment and other suppliedmaterials. Make all necessary repairs and apply touch up paint as required priorto final inspection and contract close out.9. All materials and equipment shall be listed by Underwriters’ Laboratories, Inc.(UL). Materials and Equipment shall meet the UL requirements of each standardin every case where such a standard has been established for that particular typeof material. Equipment shall be UL listed as an entire assembly or system.B. Prior Approvals1. All requests for prior approvals must be received by the Engineer at least sevenworking days prior to bid date. Applications for prior approval shall be consideredonly from Contractors submitting bids on the Project. Contractors shall determinewhether materials receiving prior approval are actually in accordance with detailsof the Specifications.2. The Contractor shall be responsible for all deficiencies that may exist from theuse of substituted products or equipment, including all additional labor andmaterials required to complete the work. All dimensions and characteristics ofsubstituted products shall be verified and coordinated with all affected trades andSubcontractors. Any required changes or modifications to the work of any othertrade or Subcontractor incurred due to using accepted substituted products shallbe coordinated and performed by this Contractor at no additional cost to theOwner.1.5 WORKMANSHIP AND CONSTRUCTION PROCEDURESA. Installation of all materials specified herein shall be performed in a neat and workmanlikemanner by workers experienced and skilled in the trade. Only the best qualityworkmanship will be accepted.B. The Contractor shall regularly clean their work area of debris. Removal of all Contractorgenerated debris and rubbish caused by their work shall be at the Contractor’s expense.C. Coordination:1. Contractor shall give careful consideration to work of other Contractors on theProject and shall organize work as detailed in the Contractor’s ¼=1’-0”coordination drawings so as to not interfere with or delay the work of othertrades.2. Contractor shall consult all Architectural, Structural and Electrical Drawings andSpecifications that apply for correlating information.3. Conflicts or interference with work of other trades shall be brought to theattention of the Engineer, in writing, before installation.4. Should the Contractor not follow above procedures and install work thatinterferes with work of other trades, the Contractor shall make all necessarychanges as directed by Engineer to eliminate the interference or conflict at theContractor’s expense.06/25/09 MECHANICAL GENERAL CONDITIONS15010-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!