12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>K. Gypsum Wallboard: Fill minor irregularities in gypsum board surface with joint compound. Sandsmooth, level with surface, when dry. Avoid raising nap of paper. Remove dust prior to painting.L. Mechanical and Electrical Work: Prepare metal surfaces as specified for steel, galvanizedmetal, aluminum, as applicable to type of material scheduled to be painted.3.04 APPLICATIONA. Apply materials according to manufacturer's instructions. Apply each coat at rate recommendedby manufacturer for the type of surface and with a dry film thickness not less than thatrecommended.B. Apply each coat to uniform appearance. If undercoats or other conditions show throughtopcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.C. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat isapplied.D. Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just priorto applying next coat.3.05 FINISHING MECHANICAL AND ELECTRICAL WORKA. Mechanical and Electrical: Use paint systems defined for the substrates to be finished.1. Paint all insulated and exposed pipes, conduit, boxes, insulated and exposed ducts,hangers, brackets, collars and supports, mechanical equipment, and electrical equipmentoccurring in finished areas to match background surfaces, unless otherwise indicated.2. Paint shop-primed items occurring in finished areas.3.06 CLEANING AND PROTECTIONA. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials fromProject site.B. After completing paint application, clean spattered surfaces. Remove spattered paints bywashing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.C. Protect work of other trades against damage from paint application. Correct damage to work ofother trades by cleaning, repairing, replacing, and refinishing, and leave in an undamagedcondition.D. At completion of construction activities of other trades, touch up and restore damaged ordefaced painted surfaces.3.07 PAINTING SCHEDULES - GENERALA. Painting schedules outline the primary paint systems required. For substrates and conditionsnot scheduled, provide paint systems recommended by paint manufacturers. Submit proposedpaint material product data for approval.B. Location and colors related to paint systems specified herein are indicated on Drawings.C. Do Not Paint or Finish the Following Items:1. Items fully factory-finished unless specifically noted.2. Fire rating labels, equipment serial number and capacity labels.04-27-11 PAINTS AND COATINGS09900 -6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!