12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 15050 - BASIC MATERIALS AND METHODSPART 1. - GENERAL1.1 SUMMARYA. Work included under this division shall consist of furnishing labor and materialsnecessary for the installation of the work called for under the Mechanical, Fire SprinklerProtection, Temperature Control and Mechanical Test & Balance contracts as listed inthe Instruction to Bidders, as specified, and as shown on Drawings to provide a complete,operable and approved system.1.2 REFERENCESA. The following is a partial list of related standards:1. Air Conditioning and Refrigeration Institute (ARt).2. American National Standard Institute (ANSI).3. American Society of Heating, Refrigerating, and Air Conditioning Engineers, Inc.(ASHRAE).4. American Society of Mechanical Engineers (ASME).5. American Society of Sanitary Engineers (ASSE).6. American Society for Testing and Materials (ASTM).7. Amencan Water Works Association (AWWA).8. Air Moving and Conditioning Association (AMCA).9. Cast Iron Soil pipe institute (CISPI).10. Manufacturer’s Standardization Society (MSS of the Valve and Fittings Industry,Inc.).11. National Electrical Manufacturers Association (NEMA).12. National Fire Protection Association (NFPA).13. Plastic Pipe Institute (PPI).14. Sheet Metal and Air Conditioning Contractors National Association (SMACNA).15. Steel Tank Institute (STI).1.3 QUALITY ASSURANCEA. Where equipment is specified by manufacturer, brand name or catalog number, this shallestablish the standard of quality and style of the product to be provided under theContract.B. Where two or more units of the same kind of equipment are required, they shall beproducts of a single manufacturer. Mixing and matching of various manufacturer’s like orsimilar components shall not be permitted.C. The Contractor shall field verify and inspect existing buildings for connections to existingsystems, equipment, and materials designated, on Drawings or in Specifications, to beused.D. The Contractor shall have full responsibility of component parts of the mechanical systemto ensure that new equipment, integrated with existing equipment and systems, willperform and operate in accordance with requirements of the Specifications withoutexcessive or unusual service or maintenance requirements.E. The Contractor shall be responsible for verifying locations of such things as piping,ductwork, equipment, door swings, heights of cabinets and counters, etc., prior to theinstallation of any mechanical equipment. Installed mechanical work that interferes with06/25/09 BASIC MATERIALS AND METHODS15050-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!