12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>B. Fabricate horizontal elements to limit finish surface to 1/240 deflection under superimposeddead load and wind uplift loads.1.07 QUALIFICATIONSA. Applicator: Company specializing in performing the work of this section with a minimum of threeyears experience and / or approved by manufacturer.1.08 MOCKUPA. Provide mockup of plaster system with accessories.B. Construct mockup, 4 feet long by 4 feet wide, illustrating surface finish and color to matchexisting.C. Locate where directed by Owner.D. Mockup may remain as part of the Work.1.09 PROJECT CONDITIONSA. Comply with ASTM C926 requirementsB. Do not apply plaster when substrate or ambient air temperature is less than 40° F or above100°F for 48 hours before, during and after stucco applications and until materials can be fullycured.C. Apply stucco to clean, adequately prepared surfaces free from dust, dirt or other deleterioussubstances.D. Provide adequate protection from contaminates and the weather for substrates prior toapplication of stucco and for stucco coat applications. Maintain in place until stucco isadequately cured.E. Protect stucco surfaces from uneven and excessive evaporation during hot, dry or windyweather. Use procedures required by climatic conditions including moist curing, providingcoverings and providing barriers to deflect sunlight and wind.F. Take necessary care to identify and protect adjacent surfaces from damage from stuccoapplication and promptly remove all droppings.PART 2 PRODUCTS2.01 MANUFACTURERA. This specification is written on the basis of using the products of Degussa Wall Systems /Senergy, Such is intended to establish minimum quality standards, not to limit competitivebidding. Products with equal or superior characteristics by other manufacturers will beconsidered under conditions of the Specifications.2.02 PLASTER BASE MATERIALSA. Cement: ASTM C150, Type 1 Portland.B. Lime: Special finishing hydrated lime, ASTM C-206, Type S.C. Aggregate: Natural or manufactured sand, in accordance with ASTM C897.D. Water: Clean, fresh, potable and free of mineral or organic matter which can affect plaster.E. Bonding Agent: ASTM C932; type recommended by manufacturer for bonding plaster toconcrete masonry surfaces.F. Plaster Sand: Must be clean and free from deleterious amounts of loam, clay, silt, soluble saltsand organic matter. Sampling and testing must comply with ASTM C144.04-27-11 PORTLAND CEMENT PLASTER (STUCCO)09220 -2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!