12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>B. Studs: Space studs at 16 inches on center unless otherwise indicated.1. Partitions Terminating at Structure: Attach extended leg top runner to structure, maintainclearance between top of studs and structure, and brace both flanges of studs withcontinuous bridging.2. Partitions Terminating at Structure: Attach top runner to structure, maintain clearancebetween top of studs and structure, and connect studs to track using specified mechanicaldevices in accordance with manufacturer's instructions; verify free movement of top of studconnections; do not leave studs unattached to track.C. Openings: Reinforce openings as required for weight of doors or operable panels, using notless than double 20 gauge studs at jambs.D. Standard Wall Furring: Install at masonry walls scheduled to receive gypsum board, not morethan 4 inches from floor and ceiling lines and abutting walls. Secure in place on alternatechannel flanges at maximum 24 inches on center.E. Blocking: Install blocking for support of plumbing fixtures, toilet partitions, wall cabinets, toiletaccessories, and equipment. Comply with Section 06100 and Drawings for wood blocking.3.03 ACOUSTIC ACCESSORIES INSTALLATIONA. Acoustic Batt Insulation: Place tightly within spaces, around cut openings, behind and aroundelectrical and mechanical items within partitions, and tight to items passing through partitions.1. Refer to Section 07212 for batt insulation (INSUL1).B. Acoustic Sealant: Install in accordance with manufacturer's instructions.1. Place one bead continuously on substrate before installation of perimeter framingmembers.2. In non-fire-rated construction, seal around all penetrations by conduit, pipe, ducts, andrough-in boxes.3. Refer to Section 07900 for (SLNT2) sealant.C. Install acoustical treatment at interior partitions where indicated on the Drawings.3.04 BOARD INSTALLATIONA. Comply with ASTM C 840 and manufacturer's instructions. Install to minimize butt end joints,especially in highly visible locations.B. Single-Layer Non-Rated: Install gypsum board in most economical direction, with ends andedges occurring over firm bearing.C. Cement Backing Board: Install over framing members in locations as indicated on drawings,and in accordance with ANSI A108.11 and manufacturer's instructions.D. Installation on Framing: Use screws for attachment of all gypsum board.3.05 INSTALLATION OF TRIM AND ACCESSORIESA. Control Joints: Place control joints consistent with lines of building spaces and as indicated.1. Not more than 30 feet apart on walls over 50 feet long and in accordance with theDrawings.B. Corner Beads: Install at external corners, using longest practical lengths.C. Edge Trim: Install at locations where gypsum board abuts dissimilar materials and as indicated.04-27-11 GYPSUM BOARD ASSEMBLIES09260 -4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!