12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 3. - EXECUTION3.1 GENERAL WIRING METHODSA. General Requirements:1. Provide 12 AWG or larger conductors for power and lighting circuits.2. Provide 10 AWG conductors for 20 ampere, 120 volt branch circuit home runslonger than 100 feet and for 20 ampere. All 120v circuits shall have dedicatedneutral conductors.3. Place an equal number of conductors for each phase of a circuit in sameraceway or cable.4. Conductors shall be tested to be continuous and free from shorts and grounds.5. Neatly install, organize, and lace wiring inside boxes, equipment, andpanelboards.6. Conductor lengths for parallel circuits shall be equal.7. Provide a minimum of twelve inches of slack conductor at each outlet.3.2 WIRING INSTALLATION IN RACEWAYSA. General Requirements:1. Pull all conductors into a raceway at the same time. Use Underwriters’Laboratories (UL) listed wire pulling lubricant for pulling No. 4 AWG and largerwires.2. Completely and thoroughly swab raceway system before installing conductors.3. Control and communication conductors shall be installed in separate, dedicatedraceway systems.3.3 WIRING CONNECTIONS AND TERMINATIONSA. General Requirements:1. Splices shall only occur in accessible junction boxes. Splices in conductorsinstalled below grade are not permitted2. Wires shall be thoroughly cleaned prior to installing Iugs and connectors.3. Splices, taps and terminations shall be made to carry full ampacity of conductorswithout perceptible temperature rise.4. Spare conductors shall be terminated with electrical tape and tagged “spare”END OF SECTION 16120WIRE AND CABLE16120-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!