12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. The cost for mechanical CAD drawing files, provided in AutoCAD, will be $50.00per sheet payable directly to Engineer of Record CAD files will be sent via emailonly.1.3 COORDINATION OF DRAWINGSA. Contractor shall submit a ¼-inch scale drawing to the Engineer indicating placement of allmechanical and electrical systems and equipment. Indicate proposed locations of allmajor equipment and materials, including but not limited to service equipment, exteriorwall and foundation penetrations, fire-rated wall and floor penetrations, sizes and locationof required concrete pads and bases, and mechanical/electrical equipment room layouts.This effort will require each trade to closely work together to produce a ¼=1’-0” set ofcoordination drawings for each area of the building.B. Coordinate scheduling and sequencing required for movement and positioning of largeequipment into the building with all other Contractors to minimize impact on their work.C. This Contractor shall provide any and all input required to complete these drawings.1.4 MATERIALS AND EQUIPMENTA. Materials:1. All materials shall be new and of the type and quality specified herein.2. Specific materials and equipment specified is intended to establish a minimumstandard of required quality. Where specified materials and equipment fail tomeet minimum standards of existing federal, state and local codes andordinances, the governing codes and ordinances shall prevail.3. The Contractor shall provide all minor miscellaneous materials necessary for thecomplete mechanical installation.4. For materials and equipment specified by description only, the Contractor shallprovide materials or equipment suitable for the purpose intended. These shall bein conformance with all governing codes, these Specifications and normal tradepractice.5. For materials or equipment specified by manufacturer’s name and catalognumber, the Contractor shall provide the item specified. The Contractor maysubmit materials and equipment for prior approval to the Engineer.6. Supply materials and equipment to the site in original packages, containers orcrates insofar as is practical. It shall be the Contractor’s responsibility to scheduledeliveries in accordance with the overall Project schedule. The Contractor shallclosely coordinate all deliveries with other Contractors.7. Provide for proper receipt, handling, storage, and protection from the elementsfor all materials and equipment to be used on this Project so as to effectivelyprevent damage or deterioration. Materials or equipment sustaining damage orundue deterioration from any cause whatsoever shall be replaced or repaired byContractor as required by the Engineer.06/25/09 MECHANICAL GENERAL CONDITIONS15010-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!