12.07.2015 Views

Buffalo Wild Wings

Buffalo Wild Wings

Buffalo Wild Wings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Buffalo</strong> <strong>Wild</strong> <strong>Wings</strong>E. Insulation must have and approved nonstyrene facer or provide a slip sheet between insulationand membrane.3.06 MEMBRANE INSTALLATIONA. Membrane Attachment: Space fasteners in accordance with manufacturer's standard andapproved submittals.B. Perimeter Sheets: Install perimeter sheets and full-sheet in accordance with fastener patternspecified by manufacturer. Install fasteners along the edge of the membrane through theinsulation, and into the roof deck.C. Field Sheets:1. Unroll membrane on the area to be covered.2. Install fasteners along the leading edge of the membrane, as illustrated in membranemanufacturer's details, through the insulation, and into the roof deck.3. Lap adjoining rolls of membrane over the fastened edge of the installed membrane by 6inches in accordance with standard details for fastener location and specific deck typepenetration requirements.3.07 FASTENING PATTERNSA. Meet the requirements of the membrane manufacturer for fastener type, spacing and pattern.3.08 SEALING OF MEMBRANEA. Lap Splices: Overlap and hot-air weld membrane without any contaminants (adhesive, dirt,debris, etc.) in the seam.1. Automatic hot-air welder and hand-held welder.2. Use hand-held welders for small work and repairs.3. Use automatic hot-air welders for field seaming.4. Caulk cut edges by applying Cut-Edge Sealant from a squeeze bottle.B. Welding of Membrane After Exposure:1. Remove visible dirt and debris with a clean cloth and water. If necessary, use a detergentcleaner (e.g. Fantastik or 409) followed by a water rinse.2. With a clean scrub pad saturated with manufacturer recommended seam cleaner,aggressively agitate the seaming area.3. Follow the standard hot-air welding procedure with an approximate 20 percent reduction inspeed.4. Final weld strength may not be achieved for several days.3.09 FLASHINGS, EXPANSION JOINTS, DRAINS, AND WALKWAYSA. Flashing: Flash perimeters as shown in manufacturer standard detail drawings. Do not coverweep holes or any form of through-wall drainage.1. Mechanically fasten all flashing at the top, under or through counter flashing, with approvedfasteners and with an approved HT termination detail as shown in detail drawings.2. Install pipe flashings in accordance with membrane manufacturer's details. Do not flash tolead.B. Two-Way Air Vents: Install two-way air vents at a rate of one for every 1,000 square feet ofdeck. Install vents centered between rows of fastening tabs.C. Roof Drains: Install in accordance with membrane manufacturer's details.1. Properly secure all bolts to provide 100-percent continuous compression of the clampingring.2. Do not run field seams through drains.3. Clean or replace existing drains as required to achieve manufacturer's recommendedclamping detail; remove old lead and packings.04-27-11 MECHANICALLY ATTACHED MEMBRANE ROOFING07535 -4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!