Draft Detailed Project Report
Rohtak
Rohtak
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />
• Production will commence during this phase and hence more engineers and senior engineers will be<br />
recruited. The number of staff has been decided based on estimated number of machines<br />
commissioned during this phase and number of shifts in production<br />
• This year some short term training courses will commence along with the starting of the second year<br />
of the long term course.<br />
• Officer sales will be recruited to support manager marketing for preparation of detailed marketing plan<br />
of the TC. The staff would be engaged in various marketing activities for wider reach of the proposed<br />
TC across the region. This would be crucial for promotion of the TC and would help departments<br />
increase their revenue<br />
• The Design and Consultancy department has been planned to commence its commercial services during<br />
this year and hence manager and senior engineers will be recruited to meet the requirement.<br />
► Year 2019-20 52 staff members<br />
The proposed TC would be fully operational by this period with activities in production, training,<br />
design and consultancy etc. Additional staff will be recruited for smooth undertaking of the gradual<br />
increase in the activities across all the departments.<br />
It is recommended to leave the position of the DGM vacant initially. The position of the DGM can be<br />
filled by a high performing senior manager within design and consulting, production or training<br />
depending upon the requirement, skill set and experience.<br />
Rest of the positions will be filled gradually as TC activity escalates and the manpower requirements<br />
increase. The tables below summarise the phasing of the organisational completion within each area;<br />
Administration and Accounting, Design and Consulting, Production, Training and Sales and<br />
Marketing, in addition to the positions of the GM and DGM. The numbers represent the numbers of<br />
employees within the specific position at a given point in time. The timeline spans from 2015 to 2026.<br />
Technology Centre Systems Program – DPR for New TC at Rohtak 102