06.09.2016 Views

Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

No.<br />

Speciali<br />

zation<br />

MiG welding (Full Time)<br />

MiG welding (Part Time)<br />

Course Name Fee /<br />

Student<br />

(INR)<br />

Annual<br />

Intake<br />

5,000 160<br />

6,000 160<br />

Minimum<br />

Qualification<br />

ITI/Basic<br />

course<br />

Pursuing<br />

ITI/Industrial<br />

workers<br />

Classrooms Laboratories Workshops<br />

Number Area Number Area Number Area<br />

Basic Arc and Gas welding (Full Time) 10,000 160 10th 1 75 2 756<br />

Basic Arc and Gas welding (Part Time)<br />

TIG welding (Full Time)<br />

TIG welding (Part Time)<br />

MiG welding (Full Time)<br />

MiG welding (Part Time)<br />

Spot Welding (Full Time)<br />

12,000 160<br />

6,000 160<br />

6,000 40<br />

6,000 80<br />

6,000 20<br />

8,000 40<br />

Pursuing<br />

ITI/Industrial<br />

workers<br />

ITI/Basic<br />

course<br />

Pursuing<br />

ITI/Industrial<br />

workers<br />

ITI/Basic<br />

course<br />

Pursuing<br />

ITI/Industrial<br />

workers<br />

ITI/Basic<br />

course

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!