06.09.2016 Views

Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

of bids etc. CMC will supervise the construction, manage the contract, monitor construction activities and will<br />

certify contractor’s progress claims, carry out quality control, testing, and prepare progress and monitoring<br />

reports, and certify bills.<br />

RFD of TCSP<br />

For monitoring the program outcomes, RFD has been defined; which tabulates the results indicators<br />

at the PDO level and intermediate outcome level together with the baselines and targets over the life<br />

of the program. Intermediate results indicators are designed to monitor critical progress toward<br />

achievement of the PDO with primary emphasis on market-tested outputs of the TCs and other<br />

stakeholders of the TCSP (viz. TPs, CNMs and ITP service provider).<br />

Active participation of Managing Director/ General Manager of CTTC will be essential to steer the<br />

operationalization of TCSP in line with the envisioned mandate. The key success parameters of the<br />

Managing Director/ General Manager include:<br />

► Revenue earned: Production, training, consultancy and others,<br />

► Recovery ratio: Revenue/ recurring expenditure (cash) in percentage,<br />

► Profit before depreciation,<br />

► Profit after depreciation,<br />

► No of trainees trained - Long term, short term,<br />

► No of enterprises assisted,<br />

► No of MSMEs out of above total enterprises,<br />

► Present technical publications showing successes delivered and how it has aided industry.<br />

TCSP’s objective is to enhance the productivity of MSMEs by improving their access to technology,<br />

business advisory services as well as skilled workers through systems of financially sustainable TCs.<br />

The table below depicts the result indicators which form a part of the RFD.<br />

Page 24 of 251

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!