06.09.2016 Views

Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

Sample monitoring and reporting template<br />

The monitoring of environmental parameters would be undertaken on quarterly basis. The<br />

responsibility of the same would lie with the concerned TC and a copy of the consolidated<br />

performance will be sent to the O/o DC MSME for their records and recommendations. The suggestive<br />

template for monitoring and reporting for the same to be adopted by the TC’s is given below. Further,<br />

during operation and maintenance of the TC, a number of potential EHS impact may be expected<br />

based on the kind of activities undertaken. These possible aspects are delineated in the EHS section<br />

of this DPR.<br />

Table 15: Sample monitoring and reporting template<br />

SN<br />

Parameter<br />

Frequency of monitoring and<br />

reporting<br />

1 Water consumption Quarterly<br />

2 Water Cess <strong>Report</strong> Quarterly<br />

3 Energy consumption Quarterly<br />

4 Waste generation and disposal<br />

Quarterly<br />

- Municipal Solid Waste<br />

- Hazardous waste<br />

- Non-hazardous waste<br />

- Other categories<br />

5 Safety records<br />

Quarterly<br />

Near Misses<br />

First Aid cases<br />

6 Training<br />

Quarterly<br />

No of students and other trained<br />

7 Air pollution and Noise pollution 6-monthly<br />

8 Internal audit report Quarterly<br />

9 Update of legal register 6-monthly<br />

Technology Centre Systems Program – DPR for New TC at Rohtak 90

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!