Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

Construction phase<br />

The activities and anticipated EHS issues during the construction phase are highlighted in the following sections:<br />

Table 53: Activities and anticipated EHS issues during construction phase<br />

Activity<br />

Clearing of land (before initiating the<br />

construction work, clearing of the<br />

shrubs and bushes shall be carried<br />

out)<br />

Excavation, drilling and levelling for<br />

the construction of foundation and<br />

base of building and roads<br />

Associated<br />

impact<br />

Soil erosion<br />

Air pollution<br />

Soil erosion/<br />

Loss of Top<br />

soil<br />

Noise<br />

pollution<br />

Occupational<br />

health<br />

hazards<br />

Disposal of<br />

debris and<br />

other wastes<br />

Recommendation for mitigation<br />

► It would be ensured that the construction activity immediately follows the clearing of land<br />

to avoid soil erosion.<br />

► Water sprinkling at regular intervals during excavation and drilling activities would be<br />

practiced to avoid generation of dust.<br />

► The excavated soil would not be stored in the direction of the wind and covers to be<br />

provided for loose construction material.<br />

► Activities like digging and filling will be avoided in conditions of very high wind.<br />

► Construction machinery will be properly maintained to minimize exhaust emissions of CO.<br />

SPM and Hydrocarbons.<br />

► Effort would be made to use the overburden within premises for landscaping.<br />

► During levelling, gradation across the land (If any) would be reduced to the extent possible.<br />

► Regular maintenance of plant equipment will be carried out.<br />

► Noise prone activities will be undertaken during day time and shall be avoided, to the<br />

extent possible, during night time.<br />

► Personal protective equipment will be provided for workers performing drilling at site.<br />

► Provision of adequate personal protective equipment like safety helmets, face masks,<br />

safety shoes, safety goggles etc. for the safety of workers.<br />

► The excavated area would be provided with a visible boundary (Usually created using a tape<br />

and sticks) to ensure safety at site.<br />

► Training will be imparted to workers on occupational safety and technical aspects of job<br />

undertaken by them.<br />

► The waste and debris would be disposed of at an identified place preferably wasteland and<br />

appropriate approval should be taken for the same from land owner or revenue authorities.<br />

► The disposal site would be at least 1000 meters away from the areas including notified<br />

forest land, water bodies and productive lands.<br />

Page 200 of 251