06.09.2016 Views

Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

Profitability<br />

Overall project profitability has been estimated considering phased investment in plant & machinery<br />

and infrastructure. The full-fledged operations are expected to start from the year 2018-19. Hence<br />

the project IRR for a period of 12 years till 2027-28 is 4.9%.<br />

Table 51: Profitability with investment plant & machinery<br />

<strong>Project</strong> IRR 4.9%<br />

Payback period<br />

>11 years<br />

The project is expected to generate positive net free cash flows starting year 2019-20.<br />

Figure 27: Net free Cash flows and Cumulative Cash flows<br />

5,000<br />

0<br />

Net free Cash flows<br />

(2,189)(252)(5) 273348412483554575606<br />

0<br />

(2,000)<br />

(4,000)<br />

(6,000)<br />

(5,000)<br />

(10,000)<br />

(15,000)<br />

(10,767)<br />

(8,000)<br />

(10,000)<br />

(12,000)<br />

(14,000)<br />

Cummulative Cash flows<br />

Page 187 of 251

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!