Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

The protection of public health, safety and general welfare will also be ensured through adherence to the building<br />

codes since these are related to the construction and occupancy of buildings and structures.<br />

Provisioning of site services<br />

The following section outlines the details of the essential measures to be designed as per regulatory<br />

requirements relating to maintenance such as;<br />

► Fire alarm and firefighting system,<br />

► Rain water harvesting,<br />

► Water treatment and sewage treatment,<br />

► Ventilation system.<br />

Fire alarm and firefighting system<br />

a) Fire alarm system<br />

► Automatic Fire alarm system will be provided in all buildings of the campus excluding student<br />

hostels and emergency staff quarters.<br />

► The system will have appropriate provisioning of smoke detectors and beam detectors with<br />

respect to the sensitivity and probability of fire.<br />

► Fire alarm panels will be provided at appropriate locations with easy and convenient<br />

accessibility for manual activation of alarm in case failure of automatic system.<br />

► A control panel will be provided at control station with a repeater panel in security cabin to<br />

activate, deactivate and reset the fire alarm system.<br />

► The instrumentation, panels, sensors and equipment used will be of certified make confirming<br />

to relevant standards.<br />

► Smoke detectors and beam detectors will be installed above and below false ceiling as<br />

applicable.<br />

b) Firefighting system – overview<br />

► Firefighting system comprising of sprinklers, yard hydrants and pumping station will be<br />

provided.<br />

► Sprinklers system will be provided in the production area (above and below the false ceiling),<br />

training block, administrative building (all floors) and other buildings etc.<br />

► Yard/ field hydrant system will be provided throughout campus with hydrant posts at<br />

appropriate locations having operating valve and hose reel provided in hose reel boxes as per<br />

standards.<br />

► Staircases in all buildings will be provided with wet risers.<br />

► The piping network will have suitable size/ diameter MS pipes welded at joints or connected<br />

with socket and threaded joints as per the regulations.<br />