Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

Consulting Stream<br />

Approximated Revenue Estimation<br />

1 shift (8 hrs.) at 25% capacity. The installed capacity assumed to<br />

be 70% running for 300 days a year. Therefore the calculation<br />

would be, 25%*[(10*100*8*300)*80%] = INR 4,20,000 per year<br />

► Revenue from other Engg. Analysis software like ANSYS,<br />

mouldflow, autoform etc. estimated to be INR 48,000<br />

Engineering Solutions<br />

Rate of INR 250/hr with an estimation of minimum requirement 100<br />

hours per product. We have estimated initially at least 4 products in<br />

first year. Therefore, 4*250*100 = INR 1,00,000/year<br />

Quality System<br />

Support<br />

Estimated rate of INR 50,000 per unit. We have estimated serving at<br />

least 2 units in the first year. Therefore, 50,000*2 = INR<br />

1,00,000/year<br />

<strong>Project</strong> Consultancy<br />

(curriculum develop,<br />

community colleges,<br />

trainers etc.)<br />

Revenues from these assignments vary significantly depending upon<br />

the nature of the assignment. We have estimated a range of INR 1-4<br />

lacs per assignment with 5-6 assignment per year<br />

Productivity Club<br />

To start with, fee of INR 20,000 per from 5 units per year. Therefore,<br />

5*20,000 = INR 1,00,000<br />

Low cost Automation<br />

Solution support<br />

To start with, fee of INR 1,00,000 per from 1 units per year.<br />

Therefore, 1*1,00,000 = INR 1,00,000