Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

Activity<br />

Movement of vehicles (Vehicle<br />

movement shall prevail at the site to<br />

transfer the material and workers at<br />

site. Apart from this, third party<br />

vehicles delivering the material and<br />

equipment shall also be there.)<br />

Use of D.G set (D.G sets shall be<br />

used at site to provide electricity to<br />

labour camps in the night time. Also,<br />

in case of non-availability of power<br />

from grid, D.G sets shall be used to<br />

provide electricity at the site for<br />

construction activity)<br />

Storage of diesel (Diesel shall be<br />

stored on-site so as to ensure<br />

availability for D.G sets)<br />

Handling of waste (During<br />

construction phase there may be<br />

generation of both hazardous and<br />

non-hazardous waste which needs to<br />

be carefully handled to ensure<br />

environment safeguard)<br />

Installation and operation of<br />

concrete mix plants and batching<br />

Associated<br />

impact<br />

Air pollution<br />

Soil<br />

contamination<br />

Water<br />

contamination<br />

Safety risks<br />

Air pollution<br />

Noise<br />

pollution<br />

Soil<br />

contamination<br />

Safety risks<br />

Land<br />

contamination<br />

and Water<br />

contamination<br />

Safety risks<br />

Noise<br />

pollution<br />

Recommendation for mitigation<br />

► All the vehicles entering the site will be asked to have updated PUC (Pollution under<br />

control) certificate.<br />

► Vehicle speed will be restricted to 15km/hour at site.<br />

► Trucks/dumpers will be covered by tarpaulin sheets during off site transportation of friable<br />

construction materials and spoil.<br />

► Maintenance of vehicles will be carried out regularly.<br />

► Sprinkling of water will be practiced at the site.<br />

► Proper maintenance of vehicle will be carried out to avoid any leakage of oil or grease.<br />

► Proper maintenance of vehicle will be carried out to avoid any leakage of oil or grease.<br />

► Vehicle speed will be restricted to 15km/hour at site.<br />

► Necessary safety trainings will be provided to the drivers of construction vehicles for speed<br />

restrictions and dos’ and don’ts will be followed during movement of construction vehicles.<br />

► D.G will be optimally used with proper orientation and adequate stack height.<br />

► Stack monitoring will be carried out on regular basis.<br />

► Proper maintenance of the DG will be carried out on regular basis.<br />

► Acoustic enclosures will be provided with the D.G sets to minimize the noise levels.<br />

► A covered area will be defined for storage of HSD with concrete flooring<br />

► The diesel storage area will not be in proximity of the labour camps.<br />

► Inflammable substance will not be allowed at the project site.<br />

► Waste will be stored at designated place after segregation on the basis of category<br />

(hazardous and non-hazardous).<br />

► Hazardous waste will be disposed of to the authorized vendors only.<br />

► A waste management plan will be chalked out to properly dispose the debris generated<br />

from the site.<br />

► Adequate PPE’s will be identified and provided to the workers at site.<br />

► Noise shielding will be used where practicable and fixed noise sources will be acoustically<br />

treated for example with silencers, acoustic louvers and enclosures.<br />

Page 202 of 251