06.09.2016 Views

Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

8. What are the key issues and challenges faced in current processes/ technologies to cater to<br />

current requirements?<br />

9. What are key technologies that are required but currently not available?<br />

10. What are key skills required for managerial manpower and machine operators?<br />

11. Existing gaps in skills required for Managerial manpower and Machine operator level?<br />

12. Additional skills required to cater to new requirements<br />

Page 230 of 251

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!