Draft Detailed Project Report
Rohtak
Rohtak
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />
transportation system in the NCR. In addition to the rail system there will also be provisions<br />
made for facilities including road network enhancements.<br />
The eight identified RRTS corridors are:<br />
► Delhi – Gurgaon – Rewari – Alwar [DGRA - <strong>Project</strong> Corridor]<br />
► Delhi – Ghaziabad – Meerut<br />
► Delhi – Sonipat – Panipat<br />
► Delhi – Faridabad – Ballabhgarh – Palwal<br />
► Delhi – Bahadurgarh – Rohtak<br />
► Delhi – Shahadra – Baraut<br />
► Ghaziabad – Khurja<br />
► Ghaziabad – Hapur<br />
The NCRPB has decided to implement RRTS in the following three corridors on priority:<br />
► Delhi – Gurgaon – Rewari – Alwar;<br />
► Delhi – Sonipat – Panipat; and<br />
► Delhi – Ghaziabad – Meerut.<br />
c) Delhi - Mumbai Industrial Corridor (DMIC): The Government of India (GOI) is establishing a<br />
Dedicated Freight Corridor (DFC) between Delhi and Mumbai, with terminals at Dadri in the<br />
National Capital Region of Delhi and Jawaharlal Nehru Port near Mumbai, covering a length<br />
`of nearly 1500 kilometers. As a strategy towards development of the project,<br />
Nodes/Cities have been identified within the Corridor as Investment Regions (IRs) and<br />
Industrial Areas (IAs).<br />
► Manesar-Bawal Investment Region (Phase-I A)<br />
► Kundli-Sonepat Investment Region (Phase-II A)<br />
► Faridabad-Palwal Investment Area (Phase- I B)<br />
► Rewari-Hisar Investment Area (Phase-II B)<br />
It covers 66% of the area of Haryana across 14 districts with an influence area of 29,362 sq<br />
kms. The value of output in the DMIC sub region of Haryana is estimated to grow by 15<br />
times over the 30 years period (2010-2040)<br />
Technology Centre Systems Program – DPR for New TC at Rohtak 72