Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

SN Issues Yes/No Remarks<br />

What is the source of water<br />

9<br />

available at the site (Ground<br />

water, surface water, municipal<br />

supply, etc.)? Is the water<br />

requirement envisaged to put<br />

additional pressure on the water<br />

No<br />

The water works facility is situated adjacent to the TRTC<br />

which draws water from the treated water from canal<br />

(4-5Kms) from the facility. The treated water can be<br />

used for drinking purpose as well.<br />

sources?<br />

The TC is envisaged to have insignificant dust emissions<br />

during the construction period. Care may be exercised<br />

Will the project lead to<br />

to minimize dust emissions and its impact, if any, on the<br />

10<br />

increased air emissions in the<br />

Yes<br />

adjoining industry. Also, during the operation phase<br />

region?<br />

appropriate measures shall be undertaken to minimize<br />

air emission in case D.G set is used for electricity<br />

backup.<br />

Increase in noise level in not envisaged in the area due<br />

11<br />

Will the project lead to increase<br />

in noise levels in the area?<br />

Yes<br />

to TC. However, care like acoustic enclosures for D.G<br />

set, in case installed, construction only in day time, etc.<br />

may be practiced.<br />

The envisaged TC will only use diesel (in case D.G set is<br />

12<br />

Will the Tool room involve use of<br />

chemicals and/or solvents?<br />

No<br />

installed). However, in case any chemicals are used<br />

appropriate measures shall be undertaken to manage<br />

and store the chemicals.<br />

13<br />

Will the project involve handling,<br />

storage and disposal of<br />

hazardous waste? If yes, what<br />

are the different types of waste<br />

envisaged from the TC?<br />

No<br />

The envisaged TC will not use chemicals. However, in<br />

case, chemicals and any other hazardous materials are<br />

used measures shall be undertaken to manage the<br />

associated waste.<br />

Is the project located in the area<br />

14<br />

of seismic faults? In case yes, in<br />

which seismic does the location<br />

Yes<br />

Yes, the region has experienced history of earthquakes.<br />

The TC location falls in the Seismic zone-4.<br />

lie?<br />

Yes, the region has experienced history of earthquakes.<br />

Is there any record of natural<br />

calamity in the area in the past?<br />

Although, so far the intensity of the earthquake was not<br />

high, however, mild tremors were felt.<br />

15<br />

If yes, what is the probability of<br />

the same effecting the<br />

operations of TC in the future?<br />

Yes<br />

The probability of such incidences in future and the<br />

same effecting operations of TC is not predictable but<br />

appropriate measures shall be undertaken to ensure<br />

minimal / no damage in case of such natural calamity.<br />