06.09.2016 Views

Draft Detailed Project Report

Rohtak

Rohtak

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technology Centre Systems Program – <strong>Draft</strong> DPR for New TC at Rohtak<br />

SN Issues Yes/No Remarks<br />

The selected site is defined as<br />

4<br />

industrial / commercial /<br />

Yes<br />

Industrial zone<br />

residential?<br />

Is there any protected area or<br />

biodiversity sensitive area in the<br />

There is no biodiversity sensitive or protected area in<br />

5<br />

vicinity which is likely to be<br />

No<br />

the vicinity which is likely to be affected by the<br />

affected by the operations of<br />

operations of the tool room.<br />

the tool room?<br />

6<br />

Is there any archaeological or<br />

cultural/heritage structure in<br />

the vicinity of the site?<br />

No<br />

There is no archaeological or cultural/heritage structure<br />

in the vicinity of the site.<br />

7<br />

Is there any group of indigenous<br />

people in and around the<br />

selected site?<br />

No<br />

There are no indigenous people in and around the<br />

selected site<br />

The allocated land has state highway on one of its side<br />

8<br />

Will the construction activity<br />

affect the surrounding around<br />

the tool room?<br />

Yes<br />

and Asian Paint factory on other side. As such<br />

construction and operation of the Tool Room is not<br />

envisaged to have any impact of the surrounding area.<br />

However, care may be exercised to minimize dust<br />

emissions from the construction activity.<br />

What is the source of water<br />

9<br />

available at the site (Ground<br />

water, surface water, municipal<br />

supply, etc.)? Is the water<br />

requirement envisaged to put<br />

additional pressure on the water<br />

No<br />

The water works facility is situated adjacent to the TRTC<br />

which draws water from the treated water from canal<br />

(4-5Kms) from the facility. The treated water can be<br />

used for drinking purpose as well.<br />

sources?<br />

The TC is envisaged to have insignificant dust emissions<br />

during the construction period. Care may be exercised<br />

Will the project lead to<br />

to minimize dust emissions and its impact, if any, on the<br />

10<br />

increased air emissions in the<br />

Yes<br />

adjoining industry. Also, during the operation phase<br />

region?<br />

appropriate measures shall be undertaken to minimize<br />

air emission in case D.G set is used for electricity<br />

backup.<br />

Increase in noise level in not envisaged in the area due<br />

11<br />

Will the project lead to increase<br />

in noise levels in the area?<br />

Yes<br />

to TC. However, care like acoustic enclosures for D.G<br />

set, in case installed, construction only in day time, etc.<br />

may be practiced.<br />

Page 225 of 251

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!