10.12.2012 Views

BC-DX TopNews WWDXC #945 BC-DX 945

BC-DX TopNews WWDXC #945 BC-DX 945

BC-DX TopNews WWDXC #945 BC-DX 945

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1730-1757 on 7205<br />

SPANISH 0000-0027 on 9445 ASC<br />

0030-0057 on 9790<br />

0200-0227 on 7345<br />

0530-0600 on 9955 RMI<br />

0800-0827 on 11600<br />

1030-1100 on 9955 RMI<br />

1400-1427 on 11720<br />

1800-1827 on 5930<br />

1900-1927 on 5930<br />

2030-2057 on 5930<br />

2300-2327 on 9440<br />

ASC=Ascension Island<br />

SIN=Sines, Portugal<br />

RMI=WRMI Miami, USA<br />

All other via Litomysl, Czech Rep.<br />

(R BULGARIA <strong>DX</strong> MIX News, Ivo Ivanov, via wwdxc <strong>BC</strong>-<strong>DX</strong> <strong>TopNews</strong> April 5)<br />

ASCENSION ISL The B<strong>BC</strong> English Bay Wind Farm has started to generate<br />

clean electricity for Ascension Island. On Thursday 18 March the first of<br />

the wind turbines started generating electricity. Since then three more of<br />

the five wind turbines have been commissioned, and last one should be<br />

running soon.<br />

The wind turbines were made by Enercon in Germany who chartered a ship to<br />

send them to Ascension. Each turbine is 37m to the top of the tower with a<br />

33m rotor diameter, making them 53.5m (176 ft) tall to the tip of the<br />

blades. The rotor spins at approximately 35rpm and always in a clockwise<br />

direction. The turbine automatically turns to face into the wind. The<br />

towers are steel and the blades are made of fibreglass. The wind turbines<br />

are the same model as on the Falklands .<br />

Each wind turbine can generate up to 330 kW (450 hp) when the wind speed<br />

is 30 mph (25 knots) or more. If the wind speed is lower than this the<br />

turbine will produce less power. The wind on Ascension is excellent for<br />

generating power as it is both strong and consistent; the wind also seems<br />

to be well correlated with the electrical load on Ascension - that is, the<br />

wind is strongest at peak times for electricity usage. The power from the<br />

wind farm goes directly into the island electricity system.<br />

Once finished the wind farm will be capable of generating up to 1650 kW on<br />

a windy day although most of the time it will average about 900 kW.<br />

Ascension Island uses between 1000 kW and 3000 kW depending on the time of<br />

day and the B<strong>BC</strong> transmitting schedule. This means that the wind farm will<br />

contribute a significant percentage of the island's electricity and help<br />

to reduce the amount of diesel burnt. This is better for the environment<br />

as it means cleaner electricity, a lower carbon footprint, fewer diesel<br />

tankers and less reliance on fossil fuels.<br />

(The Islander, Apr 6, by Andy Sennitt-HOL, RNW MN via dxld)<br />

AUSTRALIA I hear that some of the transmitters decommissioned by CVC at<br />

Darwin may be going on to useful second (third?) lives: two 100 kW could<br />

wind up at Radio Australia, Shepparton, if rather expensive shipping costs<br />

of a megadollar can be covered. RA may also be getting a 300 kW<br />

transmitter, DRM-capable, and some new antennas to serve Africa and SW<br />

file:///Z|/DOKUMENTATION-BULLETINS/WW<strong>DX</strong>D-<strong>BC</strong><strong>DX</strong>/2010/<strong>BC</strong><strong>DX</strong>959.TXT[11.06.2012 10:40:01]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!