130218_Luxor-Egypt SECAP Final
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EGP 340,910 (€ 16,148), offering a very attractive return on investment 12 .<br />
The initial projects need to be tightly monitored to register impact on energy consumption reduction to<br />
prepare progressive enlargement to a larger number of targeted building. Obviously the design and<br />
construction of new buildings should follow more stringent rules and new requirements allowing far better<br />
energy performance.<br />
4.1.1.4 Expected results<br />
Assumptions:<br />
- Staff awareness will result in 10% reduction of all consumption due to behavioural changes. This<br />
level of reduction doesn’t appear to be hard to achieve, as there are currently no precautions at<br />
all to avoid unnecessary electricity usage.<br />
- Working on lighting will cut electricity consumption by 30% of this sector (20% of total electricity)<br />
- Efficient AC devices will cut electricity consumption by 30 % of this sector (70% of total electricity)<br />
Energy in MWh/year<br />
GHG in tCO2eq/year<br />
Situation in 2015 Cut expected in 2030 Situation in 2030 / BAU<br />
Energy GHG Energy GHG GHG (BAU) Cut / BAU<br />
All municipality buildings 4,718 2,595 - 1,740 - 957 3,347 29 %<br />
Staff awareness campaign (10% cut) - 470 - 258<br />
Switch to LED lighting and sensor systems<br />
in buildings (30% cut)<br />
- 283 - 156<br />
Switching to more efficient AC devices<br />
(30% cut)<br />
- 987 - 543<br />
Note: Impact of long-term measures can only be assessed based on average ratio unless the Governorate defines the level of<br />
investment it is prepared to allocate to this topic.<br />
4.1.1.5 Budget<br />
These figures are rough estimates of budget required per action for the period 2018-2020 and ROI<br />
Staff awareness campaign (10% cut) 30,000 € 3 years<br />
Switch to LED lighting and sensor systems in buildings (30% cut) 40,000 € 6 years<br />
Switching to more efficient AC devices (30% cut) 100,000 € 4.5 years<br />
Street lighting<br />
4.1.2.1 Current status<br />
Street lighting in the City of <strong>Luxor</strong> consumes 5.6 GWh of electricity per year (2015 reference), which<br />
represents an overall annual cost of 4.2 Million EGP (equivalent 201,439 €). Note that this doesn’t include<br />
lighting of heritage sites.<br />
12<br />
Energy efficiency Project – Waty El Watt, UNDP and GEF, available at : http://www.php.eepegypt.org/<br />
51