- Get a good understanding of the breakdown in different type of waste as a basis to design the most<br />

appropriate model of separate waste collection to sort material that can be recycled (paper and<br />

carton, plastic, metal, glass), keeping apart organic waste that could be directed to methanisation<br />

and leave only residual waste for landfilling.<br />

- Optimize the service with adequate containers for the suitable neighbourhood, appropriate<br />

collection tours to reduce transport costs.<br />

- Structure recycling’ chains giving value to material actually wasted and generating additional<br />

activities that will create jobs.<br />

- Specifically explore the benefit of installing bio-digesters units around the City of <strong>Luxor</strong>.<br />

- Explore the benefit or recovering methane form the landfill to capture it, hence significantly reducing<br />

GHG from the City of <strong>Luxor</strong>.<br />

Additionally, the City of <strong>Luxor</strong>, which is very concern by the need to improve cleanliness of the city to increase<br />

its attractiveness for tourists, would benefit from designing and implementing a plan to raise public<br />

awareness on waste management, to reduce waste generation and develop recycling.<br />

4.1.4.3 Expected results<br />

Assumptions:<br />

- Reducing energy consumption by 20% due to waste collection optimization,<br />

- 20% recovery of GHG emission from landfilling,<br />

- Impact of possible bio-digesters development is not considered at this stage, and<br />

- Significant additional reduction could be obtained from a radical change in waste management,<br />

reducing drastically the amount of waste going to landfill and producing energy from waste.<br />

Energy in MWh/year Situation in 2015 Cut expected in 2030 Situation in 2030<br />

GHG in tCO2eq/year<br />

Energy GHG Energy GHG GHG (BAU) Cut / BAU<br />

Solid waste management 12,326 25,577 - 2,465 - 4,463 32,994 14 %<br />

Energy efficiency 12,326 5,001 - 1,000 - 348<br />

Non-energetic emission 20,576 - 4,115<br />

4.1.4.4 Budget<br />

These figures are rough estimates of budget required per action for the period 2018-2020 and ROI<br />

Energy efficiency 50,000 € 3 years<br />

Non-energetic emission<br />

To be define<br />

55