3. - Schlösser-Magazin
3. - Schlösser-Magazin
3. - Schlösser-Magazin
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4. Area<br />
118<br />
4. State of Conservation and Factors Affecting the Property<br />
Work carried out Scheduled for<br />
North and south quarter-circle<br />
pavilions<br />
Restoration of interior fixtures, roof 1964-1966<br />
Palace theatre Fire-protection measures 1964<br />
South cour d’honneur wing and<br />
kitchen building<br />
Conversion to School of Court Registrars 1966-1968<br />
Palace chapel Restoration of interior 1966-1968<br />
Mosque Partial restoration 1970-1974<br />
District Court Complete restoration 1970-1974<br />
Palace theatre Reconstruction of stage area 1972-1975<br />
Orangery Restoration of surrounding garden 1975-1976<br />
Lower waterworks Partial restoration 1976-1978<br />
Roman water-fort Complete restoration 1977-1979<br />
Bridges in palace gardens Repair of all wooden bridges 1979-1980<br />
Bathhouse Partial restoration 1979<br />
Main wing of palace Structural work to main wing: 1975-1982 1975-1982<br />
Restoration of interiors: 1984-1991<br />
1984-1991<br />
Disabled soldiers‘ barracks Complete restoration 1983-1988<br />
18th-century metal gates Restoration of all metal gates 1987-1995<br />
Temple of Apollo Complete restoration 1984-1986<br />
Bathhouse kitchen Roof repairs 1983-1985<br />
Diorama Complete restoration 1988-1991<br />
South quarter-circle pavilion Complete restoration, interiors, roof 1983-1993<br />
Watercourses: canals, ponds and Repairs to banks, walls and retaining 1965-2006<br />
lake<br />
battens (ongoing)<br />
Palace theatre Fire protection 2000-2006<br />
Chinese bridge Complete restoration 1992<br />
Mosque, colonnades Complete restoration 1990-2001<br />
Water-spouting birds Complete restoration 1988-1993<br />
Statuary Replacement of all original sculptures<br />
with copies<br />
1970-2004<br />
Minerva Temple Complete restoration 1990-2000<br />
Orangery Compl. interior and exterior restoration 1993-1999<br />
Upper waterworks Complete restoration 1994-2000<br />
Bathhouse Compl. interior and exterior restoration 1999-2006<br />
Palace restaurant Compl. overhaul of technical installations 1995-1998<br />
Mosque: dome Complete restoration 2000-2006<br />
Palace chapel, north wing of<br />
palace<br />
Complete restoration 1998-2002<br />
Palace theatre Complete interior restoration 2000-2006<br />
North quarter-circle pavilion Restoration of roof 2004-2007<br />
Lower waterworks Structural renovation, Stage 1 2005--2010