12.01.2013 Views

Q2 Z2,(Q2) Z2(Q2) - Institute for Water Resources - U.S. Army

Q2 Z2,(Q2) Z2(Q2) - Institute for Water Resources - U.S. Army

Q2 Z2,(Q2) Z2(Q2) - Institute for Water Resources - U.S. Army

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Equation (4.37) divides the total :Lim! in a year into the sum of the<br />

tin.o. during which a towboat is actually making trips and the time dur-<br />

ing which it is inactive because of major repairs or lack of business.<br />

From Equation (4.37) running time is the difference between active<br />

time and total delay time.<br />

10<br />

t r = t - t..<br />

a i<br />

i=1<br />

t T y<br />

r<br />

j=1<br />

T r = T f + T a N a + T d N d'<br />

t = t..<br />

o a<br />

i=1<br />

i/l, 6, 9<br />

(4.38)<br />

The aggregate running time may be related to individual trip time by<br />

(4.39)<br />

inwhichT rj is the time required to make the jth trip, and there are<br />

J trips in a year. Note that the previous analysis of the tow in mo-<br />

tion permits the estimation of trip running time.' Repeating Equation<br />

(3.3) above.<br />

(4.40)<br />

i.e., <strong>for</strong> any given trip, the running time'is the sum of the time dur-<br />

ing which the tow operates at full speed, T f , and the time during<br />

which it is accelerating or decelerating, T aNa + Td Nd .<br />

Define total miscellaneous delay time in a year as<br />

10<br />

(4.41)<br />

110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!