(unpublished report, Jan. 1966). This report and a similar one<br />

<strong>for</strong> barges are prepared annually by the Transportation Economics<br />

section.<br />

32. A full reference citation to this work is contained above in<br />

note 20 to Ch. II.<br />

33. Mcycr, ct al.. i.<br />

p. 4.<br />

35. Illid., p. 52.<br />

36. nid., pp. 308-15.<br />

37. The price-adjusted cost figures in the te::t do not reflect technological<br />

and institutional improvements that occurred in the<br />

intervening years. Since such improvements did occur, it is<br />

likely that the price-adjusted figures are 1.00 high. Ideally,<br />

one would want to per<strong>for</strong>m the statistical analysis using more<br />

recent data, but this is precluded here by the magnitude of the<br />

task. Moreover, the purpose of this subsection is primarily to<br />

illustrate a method of combining statistical and engineering cost<br />

analysis. No claim is made that current rail costs arc estimated.<br />

203 .