study as to the level of output to which his estimate corresponds.<br />

However, our figure of $1.578 does appear qufte reasonable. One<br />

would have to add an estimate of direct barge expense and indirect<br />

expense to our estimate to make it directly comparable to Meyer's<br />

* figure.<br />

In summary, the results <strong>for</strong> the towboat cost function are quite<br />

generally consistent with a priori expectations and result in reason-<br />

able overall predictions of average cost. The evidence presented<br />

indicates that there is strong dependence of cost upon towboat char-<br />

acteristics and the physical characteristics of the various waterways.<br />

Both long-run and short-run average costs are declining, indicating<br />

,•<br />

that if output was to be expanded, a major category of total average ,<br />

cost would be declining, at least <strong>for</strong> a wide range of output.<br />

83