Implementation of the mass disposal of drums containing especially hazardous substances,<br />

means primarily the creation of conditions which exclude the impact of hazardous substances in<br />

the environment due to the unsatisfactory state of the container and its storage<br />

conditions. However, the process of disposal of drums itself can also lead to contamination of<br />

both air and soil and groundwater. In this regard, the requirements for organizational and<br />

technical measures were developed to prevent the emission of eliminated substances and their<br />

products during the launch phase and operation.<br />

Safety requirements before launching into operation processing facility (or individual units) of<br />

mass elimination drums imply an integrated commissioning and testing of all technology<br />

systems and individual equipment.<br />

In the course of these works on drums layouts should:<br />

conduct external inspection and ensure proper condition of all equipment and communications;<br />

check the functioning of the shut-off and control valves communications technology of all units<br />

installed;<br />

check the operation of all locks of the actuators of the entire installation, in particular modules<br />

MIN and MNO;<br />

test instrumentation and other means of automation;<br />

verify the completeness of individual packages in the self-first aid kit;<br />

establish the technological parameters of the elimination of dangerous substances with the use of<br />

drums of all sizes, and then refine them in trial runs of individual components and the entire<br />

installation as a whole.<br />

Before running each type of equipment it is necessary to convert it in a regulated state and<br />

check:<br />

availability of uninterrupted power supply and pressure of compressed air in pneumatic systems;<br />

the presence of regulated air pressure differential between the working chamber MIN and the<br />

environment created by the ventilation system;<br />

have a working vacuum in the technological tying launched site installation;<br />

the presence of a regulated supply of reagent to enter into MIN;<br />

availability of technical liquids in containers of consumables;<br />

the filling of collections, measuring tanks, receiving tanks, reagent solutions;<br />

compliance with state perenalazhennogo equipment, parts and components frame size drums<br />

allocated to extract the substance;<br />

original position of all equipment, all units and mechanisms.<br />

In conducting the process of mass of disposal of drums should be provided for the following<br />

activities:<br />

working space in which operations are carried out by extracting, pumping or chemical<br />

neutralization of highly dangerous substances (hereinafter - the "dirty room"), with optional<br />

forced-air ventilation;<br />

All work performed during the operation of supply and exhaust ventilation;<br />

state ambient air of industrial premises should be continuously monitored;<br />

All persons working in "dirty rooms" are provided with personal protective equipment (PPE);<br />

production staff of "dirty room" up to and after the work has to undergo a medical examination;<br />

All work associated with sampling starting material, the reaction mixture, used reagents and<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development<br />

of Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />

Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />

164