2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international
2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international
2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3 041 80 46'26,7'' 47 39'51,8''<br />
4 042<br />
5 043<br />
6<br />
80 46'27,2'' 47 39'55,7''<br />
80 46'26,9'' 47 39'58,0''<br />
including 2 drums with spent oil.<br />
Sampling was done in May, 2010 .<br />
PCB was detected<br />
Small accumulation of drums,<br />
including 4 drums with oil and spent<br />
oil.<br />
3 drums with spent oil 2, solid oil<br />
1<br />
Accumulation of 9 drums with solid<br />
oil<br />
FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development<br />
of Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />
Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />
224<br />
+ 02-041<br />
+ 03-042<br />
044 80 46'28,1'' 47 39'57,1'' -<br />
045 80 46'27,8'' 47 39'56,9'' + 04-045<br />
046 80 46'27,7'' 47 39'58,0'' -<br />
047 80 46'27,7'' 47 40'01,8'' -<br />
048 80 46'28,1'' 47 40'01,8'' -<br />
049 80 46'28,1'' 47 Accumulation of 30 50 drums<br />
with spent oil and empty drums for<br />
oil. Points are accumulation<br />
boundaries.<br />
39'59,3''<br />
-<br />
7 050 80 46'28,0'' 47 39'38,3''<br />
Two groups of wooden drums, spent<br />
oil and solid oil. Sampling was done<br />
in May, 2010 . PCB was detected<br />
8 051 80 46'26,7'' 47 39'09,8'' 3 drums with oil -<br />
9 052 80 46'26,5'' 47 39'05,4'' 3 drums with spent oil + 05-052<br />
10 053 80 46'26,1'' 47 38'59,6'' 33 drums with spent oil, oil, empty -<br />
11 054 80 46'24,1'' 47 38'54,3'' 5 drums with spent oil, very viscous + 06-054<br />
12 055 80 46'25,1'' 47 39'11,2'' 17 drums with spent oil + 07-055<br />
As part of the compacting drum was found that the number of drums, containing PCB-waste,<br />
was 8 pieces. Indicated drums were marked with white paint, and moved to temporary storage<br />
site approximately 100m south of the working platform.<br />
-<br />
-