esidual content of less than 50 ppm PCB are sent for recycling as secondary raw materials, and<br />

nonmetallic materials are subject to thermal disposal.<br />

11.3.3.3 Solvent regeneration stage<br />

Technological scheme of solvent recovery is shown in Figure 11.3.3 Regeneration of the solvent - a<br />

selection of pure methylene chloride from its mixture with the remnants of PCB is carried out<br />

periodically. To do this, PCB pollution of methylene chloride from the cube-evaporator E1 install<br />

cleaning of the transformer is pumped into the vessel through the side E8 fitting. Evaporation of<br />

methylene chloride is produced by heating the hot water tank through a shirt E8. As the spray droplet<br />

separator liquid with vigorous boiling is a layer of nozzles at the top of the tank.<br />

Pair of methylene chloride from tank E8 coming into the condenser T5 cooled brine. Condensed<br />

methylene chloride is discharged into the tank E9 cooled brine. Pickle served in a tank shirt E9, and from<br />

it comes in a condenser T5.<br />

Regenerated solvent - methylene chloride - back to the installation of the transformer cleaning for reuse.<br />

Pair of methylene chloride from tank E9 trapped in absorber K3 with activated charcoal. The service<br />

activated carbon is determined by its sorption capacity.<br />

Completion of the distillation of methylene chloride from a mixture of PCB determined in the following<br />

two criteria:<br />

termination of reducing capacity in the E8;<br />

increase in temperature of the liquid in the tank E8.<br />

The exact content of residual dichloromethane in the bottoms liquid is determined by chromatographic<br />

analysis and is equal to 3 1 %.<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development of<br />

Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the Example of<br />

Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />