03.03.2013 Views

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Picture 3.1.12 High-voltage current transformer at the transformer dump (site330) in the surveyed area of<br />

the radar station<br />

Picture 3.1.13 High-voltage current transformer at the transformer dump (site330) in the surveyed area of<br />

the radar station<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development of<br />

Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />

Example of Alexandra Island of Franz Josef Land Archipelago from Hazardous Waste<br />

49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!