13.2. Selection of industrial site to place experimental processing line and installation of<br />
equipment<br />
Choosing technological platform based on the fact as to ensure easy transportation of the<br />
drums, subject to compaction, convenience and environmental safety of the operations.<br />
To select the technology platform in preparation for the expedition, 30 - 31 May, the chief<br />
curator of the expedition and flew to FJL on frontier post Nagurskoe to select sites for future<br />
work. Principles of site selection were the following requirements:<br />
compact (not further than 150 m) the location of empty and partially filled with a large (at<br />
least several thousand) the number of drums from the place of work<br />
presence of a flat area measuring 70 x 70 meters free of drum and other wastes for<br />
placement process modules and equipment, and safe helicopter landing<br />
possible entrance to the site by road during the summer (with no or little snow cover)<br />
Given these requirements, as well as the results clarify the boundaries dump fuel and<br />
lubricant, we chose a site with the coordinates of the center 80 ° 46'25, 9''N 47 ° 39'56, 6''E<br />
Deployment plan for the technological platform in printed form at 1:1000 scale with the<br />
geodetic reference objects according to the Global Positioning System is presented in Figure<br />
2.2 ..<br />
Indicated the location of the site due to the following benefits:<br />
- A relatively smooth surface ensures compliance with requirements for installation of<br />
manufacturing equipment;<br />
- 130 meters to the northwest are whole empty tanks (tank) capacity of 25 cubic meters, which<br />
can be draining technical liquids from containers;<br />
- In the immediate vicinity of the technological platform is accumulation of drums from the<br />
technical liquids, which greatly facilitates their transportation to the work site;<br />
- Distance from the shoreline, as well as the prevailing wind direction during the experimental<br />
work to minimize possible negative effects on the environment;<br />
- After the experimental work can be done to transport compacted drum for subsequent<br />
shipment to a specialized company<br />
FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project<br />
Development of Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in<br />
the Arctic by the Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />
203