Table 4.3.2 Facility record in the area of radar station<br />

Name<br />

Coordinates, WGS-84<br />

Latitude Longitude<br />

1 170 Radar antenna 80° 48' 14.5'' 47° 32' 43.8''<br />

2 171<br />

Accumulation of drums with fuel and<br />

lubricant<br />

80° 48' 14.1'' 47° 32' 39.2''<br />

3 172<br />

Industrial and construction waste<br />

dump<br />

80° 48' 14.6'' 47° 32' 41.7''<br />

4 169 Destroyed radar station building 80° 48' 14.3'' 47° 32' 47.5''<br />

5 162 Destroyed building 80° 48' 15.2'' 47° 33' 12.2''<br />

6 164<br />

Destroyed building - transformer and<br />

condenser storage facility<br />

80° 48' 13.7'' 47° 32' 54.4''<br />

7 157<br />

Industrial and construction waste<br />

dump<br />

80° 48' 14.6'' 47° 33' 28.2''<br />

8 145 Destroyed radar station building 80° 48' 14.8'' 47° 33' 35.5''<br />

9 141<br />

Industrial and construction waste<br />

dump<br />

80° 48' 15.9'' 47° 33' 41.5''<br />

10 142 Radar antenna 80° 48' 15.0'' 47° 33' 38.0''<br />

11 136 Gantry 80° 48' 15.0'' 47° 33' 55.6''<br />

12 7 Cable power line 80° 48' 15.1'' 47° 33' 37.0''<br />

13 139<br />

Industrial and construction waste<br />

dump<br />

80° 48' 14.3'' 47° 33' 45.7''<br />

14 175 Destroyed building 80° 48' 14.5'' 47° 32' 35.1''<br />

15 176<br />

Industrial and construction waste<br />

dump<br />

80° 48' 14.0'' 47° 32' 31.3''<br />

16 174 Cistern with fuel and lubricants 80° 48' 15.0'' 47° 32' 34.6''<br />

17 173 Cistern with fuel and lubricants 80° 48' 14.9'' 47° 32' 37.2''<br />

18 161 Cistern with fuel and lubricants 80° 48' 15.0'' 47° 33' 06.7''<br />

19 142 Cistern with fuel and lubricants 80° 48' 15.2'' 47° 33' 41.3''<br />

20 137 Cistern with fuel and lubricants 80° 48' 15.6'' 47° 33' 47.9''<br />

21 144 Cistern with fuel and lubricants 80° 48' 14.3'' 47° 33' 44.1''<br />

22 328<br />

Industrial and construction waste<br />

dump<br />

80° 48' 15.3'' 47° 32' 54.3''<br />

23 329 Accumulation of 200-L drums 80° 48' 13.5'' 47° 32' 39.4''<br />

24 330 Transformer dump 80° 48' 14.6'' 47° 32' 41.7''<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development of<br />

Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />

Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />

70