03.03.2013 Views

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10 DEVELOPMENT OF TECHMOLOGICAL PROJECT FOR HANDLING OF<br />

WASTE, TECHNOLOGICAL EQUIPMENT AND ITS PARTS CONTAINING<br />

HEAVY METALS<br />

10.1 Main technological solutions<br />

10.2 Options for the implementation of technological solutions 169<br />

10.3 Industrial safety requirements 171<br />

11 DEVELOPMENT OF TECHMOLOGICAL PROJECT FOR CONSERVATION<br />

OF OBJECTS CONTAINING SOVTOL OR OTHER PCB-CONTAINING<br />

LIQUIDS<br />

173<br />

11.1 General information 173<br />

11.2 Technological solutions for conservation of sovtol and other pcb-containing liquids 174<br />

11.3 Plan and procedures for conservation (liquidation) of drums, transformers and<br />

condensers containing sovtol and other PCB-containing liquids<br />

174<br />

11.3.1 Plan and technological cycle for conservation of objects containing sovtol and<br />

other PCB-containing liquids<br />

174<br />

11.3.2 Procedures for conservation (liquidation) of drums containing sovtol and other<br />

PCB-containing liquids.<br />

176<br />

11.3.3 Procedures for conservation (liquidation) transformers, condensers and<br />

containers containing sovtol and other PCB-containing liquids.<br />

183<br />

11.3.3.1 PCB discharge stage 183<br />

11.3.3.2 Stage of washing of transformer (condenser) with methylene chloride 187<br />

11.3.3.3 Solvent regeneration stage 188<br />

11.3.4 Procedures for conservation (liquidation) of sovtol and other PCB-containing<br />

liquids .<br />

190<br />

11.3.4.1 Stage of high-temperature oxidation of PCB-waste 190<br />

11.3.4.2 Stage of PCB-waste sulphonation with further neutraliztion by saltforming<br />

agent<br />

195<br />

11.4 Conclusions and recommendations 198<br />

12 PURCHASE AND TESTING OF NECESSARY TECHNOLOGICAL<br />

EQUIPMENT<br />

13 SELECTION OF INDUSTRIAL SITE AND INSTALLATION OF EQUIPMENT 201<br />

13.1. Determination of boundaries drum storage facility and dumpnear the Severnaya 201<br />

Bay<br />

13..2. Selection of industrial site to place experimental processing line and installation of 203<br />

equipment<br />

14 EXPERIMENTAL TESTING OF MODERN TECHNOLOGIES OF DRUM 211<br />

DISPOSAL IN ARCTIC CONDITIONS WITH LARGE NUMBER OF DRUMS<br />

OF DIFFERENT PERIODS OF PRODUCTION AND CONTENT<br />

14.1 Experimental disposal of drums by burning up and compacting 212<br />

14.2 Experimental handling of waste containing heavy metals and PCB 223<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development of<br />

Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />

Example of Alexandra Island of Franz Josef Land Archipelago from Hazardous Waste<br />

166<br />

166<br />

200<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!