35 251 Stack of 200-L drums 80° 46' 25.7'' 47° 39' 43.5''<br />
36 252 Accumulation of 200-L drums 80° 46' 26.6'' 47° 38' 57.6''<br />
37 253<br />
Accumulation of wooden drums with<br />
semisolid lubricant<br />
80° 46' 27.8'' 47° 39' 37.7''<br />
38 254<br />
Accumulation of wooden drums with<br />
technical liquids<br />
80° 46' 28.6'' 47° 39' 43.8''<br />
39 255<br />
Accumulation of wooden drums with<br />
industrial waste<br />
80° 46' 27.7'' 47° 39' 57.7''<br />
40 256 Iscrap metal dump 80° 46' 27.7'' 47° 40' 04.2''<br />
41 191 Fuel and lubricant cisterns 80° 46' 27.2'' 47° 39' 24.9''<br />
Before the start of the compacting drum supporting expeditionary group has prepared a working<br />
platform. Unloading RV "Mikhail Somov" performed by helicopter. On the bank of the auxiliary<br />
expedition group, and half of the main Expeditionary Unit. The second half of the main<br />
Expeditionary Unit helped the crew to deliver expeditionary cargo from the hold, and ship them<br />
to the helicopter. Total for unloading cargo forwarding has been involved eight flights helicopter.<br />
Unloading equipment from RV "Mikhail Somov" in the following manner:<br />
First flight (08.08.) Went part of the expedition staff (4 persons) from the expedition cargo was<br />
taken only bars, mini tractor and a portion of the working tool (jack, crowbars).<br />
Until the helicopter returned for the next installment of the expedition cargo (half a module),<br />
Expeditionary Group at the bank have been placed on the prepared jobsite six boards as the<br />
foundation.<br />
The second flight was taken half a module. Expeditionary Force took one half-module and align<br />
it on the bars.<br />
The third flight was taken to the second half of the working module. Expeditionary Force docked<br />
both halves on the uneven bars.<br />
The fourth flight was taken to the press and installed on site.<br />
The fifth, sixth and seventh flights brought three containers of equipment, food, generators,<br />
clothing, etc. on the frontier post Nagurskoe.<br />
Eighth flight of the remainder of the expedition was brought to the frontier post Nagurskoe.<br />
After collecting the entire Expeditionary Unit on the frontier post Nagurskoe and<br />
accommodation in a hostel, was produced by disassembling containers. All tools, kiln drum,<br />
gasoline and diesel oil have been stored on the ramp next to the hostel. Not the next day 09.08.<br />
the entire cargo was delivered to the jobsite. The whole day was spent in the assembly of the<br />
module, run the press and the kiln.<br />
Placed on the technological platform equipment (see Figure 2.2.3) included the following items:<br />
- Technological module placed in their heat generator for thawing drums, the frozen remains of<br />
fuel and lubricant or water, and equipment for opening and cleaning the drums;<br />
- drum thermal decontmination instllation Fakel-1M;<br />
- hydraulic press TM-22TPF produced by "Tochnaya Mekhanika";<br />
- 220 v and 380 v gasolene and Diesel generators for energy consumers.<br />
Technological equipment (press, Fakel-1M, gasolene generators) wasradially installed at a<br />
distance of 7,0 ... 11,0 m from the production module in an easterly direction. Such an<br />
arrangement of equipment allowed to form a working platform (Work area), which provides free<br />
FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development<br />
of Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />
Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />
206