03.03.2013 Views

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

2 ОРГАНИЗАЦИЯ И МЕТОДИКА РАБОТ - Courrier international

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

combustion. The results of the analysis revealed the following:<br />

- in a stream of exhaust gases of CO were no detected;<br />

- CO2 content is located within 300 mg/m3;<br />

- content of NO2 in the range 1.4 mg/m3;<br />

- total hydrocarbon content does not exceed 170 mg/m3.<br />

The analysis of scrapings from the charred drum surface showed that the total hydrocarbon<br />

content below the detection limit, ie completeness of processing is achieved.<br />

Thus, the combustion of fuel and lubricant in a stream of air carbon monoxide (CO) is formed.<br />

As a result of burning fuel and lubricant produced carbon dioxide (CO2), as well as due to high<br />

temperature, nitrogen, air partially oxidized up to nitrogen dioxide (NO2). Also, when firing the<br />

drums from the oil, mining, etc. can form soot, as possibly incomplete combustion of<br />

hydrocarbons, used as the installation is not a burner with the flame, and installation, pumps air<br />

into the tank to burn fuel and lubricant.<br />

At the disposal of the expedition had the amount of hydrocarbon gas analyzer "GIAM - 315" - a<br />

device for control of the hydrocarbons. Results for the control of the hydrocarbons are given in<br />

Table 14.6.<br />

Table 14.6 Data on content of of total mass concentrations of saturated hydrocarbons in air (in<br />

carbon equivalent)<br />

Number<br />

of Point<br />

<br />

N E Date Time .<br />

mg/m 3 Note<br />

017 80 46'24,8'' 47 39'48,6''<br />

018 80 46'23,0'' 47 39'48,6''<br />

019 80 46'27,5'' 47 40'23,0''<br />

020 80 46'29,0'' 47 40'05,3''<br />

11.08.10. 10:30 132<br />

11.08.10. 12:07 138<br />

14.08.10. 10:12 140<br />

14.08.10. 12:34 145<br />

15.08.10. 13:57 162<br />

15.08.10. 16:14 126<br />

11.08.10. 10:35 108<br />

11.08.10. 12:13 135<br />

14.08.10. 10:18 123<br />

14.08.10. 12:40 140<br />

15.08.10. 14:02 133<br />

15.08.10. 16:19 114<br />

11.08.10. 10:47 125<br />

11.08.10. 12:26 147<br />

14.08.10. 10:31 134<br />

14.08.10. 12:52 157<br />

15.08.10. 14:15 136<br />

15.08.10. 16:33 146<br />

11.08.10. 10:51 158<br />

11.08.10. 12:33 160<br />

14.08.10. 10:35 155<br />

14.08.10. 12:57 160<br />

15.08.10. 14:20 136<br />

15.08.10. 16:37 146<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development<br />

of Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />

Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />

229<br />

Point is located a bit west of the<br />

site and far from the sea.<br />

Sampling was done during work<br />

and 0.5 hour before or after work.<br />

Point is located a bit west of the<br />

site and close to the sea. Sampling<br />

was done during work and 0.5<br />

hour before or after work<br />

Point is located a bit east of the<br />

site and close to the sea. Sampling<br />

was done during work and 0.5<br />

hour before or after work<br />

Point is located a bit east of the<br />

site and far from the sea.<br />

Sampling was done during work<br />

and 0.5 hour before or after work<br />

016 80 46'25,9'' 47 39'56,6'' 11.08.10. 10:59 158 Point is located at the study site

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!