The remaining drums were empty.<br />

In the zone number 2 showdown bottom of the drums was carried out angle grinder (grinder).<br />

Experimental work carried out by firing the drums with the use of mobile plant incineration of<br />

waste fuel and lubricant type Fakel-1M.<br />

Connection setup performed with an electric motor was carried out after ground installation and<br />

trial inclusion.<br />

Initially, the combustion chamber fell to the bottom position, then wore the top tips. After<br />

installing the nozzle combustion chamber rose to its highest position.<br />

Is filled drums (initial load - no more than 5-10 kg), so as to avoid pollution at its outer surface.<br />

Filled drum mounted on the frame and down the combustion chamber in the drum so that the<br />

lower part of the combustion chamber with the guide ribs is in the cask. Produced ignition, after<br />

ignition of residual fuel and lubricant included blower and sets minimum speed. After the<br />

installation mode (about three minutes), blower speed is set so as to maintain a minimum<br />

dymlenie and reaches its maximum fullness of burning waste. After graduating from burning<br />

waste plant will not turn off up to a complete cessation of the burning process and cool the hot<br />

parts (2 -3 minutes). The subsequent firing of drums in a similar way.<br />

While working at the facility Fakel-1M meet the following safety requirements:<br />

- Working personnel previously trained and briefed on safety requirements;<br />

- The installation was properly grounded;<br />

- Fixing the combustion chamber was carried out for each position of a safety stopper;<br />

- Intermediate storage of subsequent destroyed 4.3 drums was carried out at least 20 meters from<br />

the plant;<br />

- Subsequent loading of oil into the drum performed only after complete cooling drums.<br />

After the elimination of waste burnt drum staged by pressing.<br />

Pressing process was carried out as follows.<br />

Prepared by compacting a drum (ie drum, which has been removed bedplate and received either<br />

install Fakel-1M, or an empty drum from the zone number 2) by two operators press mounted<br />

vertically in the working chamber of the press.<br />

After installing the drum closed gate chamber and was pressing<br />

FINAL REPORT for Contract No. CS-NPA-Arctic-13/2009 of December 01, 2009 within the framework of pilot project Development<br />

of Technology of clean up of the area of Decommissioned Sites of The Russian Federation Ministry of Defense in the Arctic by the<br />

Example of Alexanra Island of Franz Josef Land Archipelago from Hazardous Waste<br />