02.05.2013 Views

User Guide - MKS

User Guide - MKS

User Guide - MKS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Adding Entries to an Issue’s<br />

Change Package<br />

Adding Entries to an Issue’s Change Package<br />

Once a change package has been created and associated with an issue, you<br />

can add entries to that change package upon any one of the following<br />

operations:<br />

“Checking Out a Member” on page 163<br />

“Checking In a Member” on page 172<br />

“Renaming a Member” on page 180<br />

“Locking a Member” on page 186<br />

“Adding Members to a Project” on page 146<br />

“Dropping Members From a Project” on page 158<br />

Refer to the Change Package portion of the panel.<br />

From the change package list, select a change package. The list presents the<br />

Change package ID then the summary, for example, 13:1 Failed<br />

Install.<br />

NOTE<br />

You can only add a member to an issue’s change package upon a check out and<br />

locking a member if lock tracking is enabled. For more information on lock<br />

tracking, see your administrator.<br />

After the operation is completed, the entry is added to the change package.<br />

The change package’s ID appears in the member’s C.P. ID (Change Package<br />

ID) column of a Project or Sandbox window.<br />

The change package ID is displayed as a hyperlink that automatically<br />

opens Integrity Manager to the specified issue. For more information on<br />

the integration, see “The Integrity Manager Integration” on page 339.<br />

345

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!