02.05.2013 Views

User Guide - MKS

User Guide - MKS

User Guide - MKS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 12: Advanced Change Package Operations<br />

368<br />

NOTE<br />

When using the Apply CP command, you can only apply closed change<br />

packages. Because you cannot apply an open change package to a project, the<br />

option for Allow Open Change Packages is disabled by default. If you<br />

need to work with an open change package, you must use the Resync CP<br />

command. For more information on resynchronizing change packages, see<br />

“Using the Resync CP Command” on page 375.<br />

Available information is displayed in the panel as follows:<br />

Tab Table Columns<br />

Change Packages C.P. ID is the identification number of the change package<br />

(in the form x:y, where x is the container ID (if<br />

Integrity Manager is enabled it is also the issue ID), and y<br />

is the change package index number).<br />

State is the state of the change package, whether open or<br />

closed.<br />

Summary is the summary description of the issue<br />

associated with the change package.<br />

u s e r g u i d e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!