Chapter 12: Advanced Change Package Operations<br />

374<br />

11 To accept the backfill list and have the listed change packages also<br />

applied to the project, click Yes.<br />

You must accept the backfill list as presented or the Apply CP<br />

operation cannot be completed. If you do not want to accept the entire<br />

list, you must use the Resync CP command instead. For more<br />

information on resynchronizing change packages, see “Using the<br />

Resync CP Command” on page 375.<br />

The Confirm Change Package Application dialog box appears<br />

indicating the operations to be performed.<br />

12 To complete the operation(s) and apply the selected change<br />

package(s), click Yes.<br />

Source Integrity completes the operation or returns information on<br />

errors and warnings if the operation cannot be successfully completed.<br />

NOTE<br />

To see any change packages that have been applied between two revisions of a<br />

project, use View Project Differences and, under Preferences, select the option<br />

for Show Applied Change Packages. For more information on viewing project<br />

modifications, see “Viewing Project Differences” on page 244.<br />