17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. 9. Transportation/Circulation<br />

• Lake Street - Lake Street is a two-lane local street running parallel to 1-5. It<br />

continues in the <strong>City</strong> <strong>of</strong> Burbank: and tenninates at Magnolia Boulevard.<br />

• Western Avenue - Western Avenue is a four lane major arterial within the study<br />

area. Western Avenue has a full cloverleaf interchange with 1-5 and serves as an<br />

important northeast-southwest corridor.<br />

• Sonora Avenue - Sonora Avenue is classified as a major arterial serving the study<br />

area. It provides four lanes and is a major connection between the study area and<br />

SR 134 via Victory Boulevard/Riverside Drive.<br />

• Grandview Avenue - Grandview Avenue is a minor arterial between Flower Street<br />

and Glenoaks Boulevard. It provides four travel lanes and on-street parking.<br />

Existing Intersection Peak Hour Traffic Volumes<br />

Existing A.M. and P.M. peak hour traffic counts, conducted in 1992, were obtained from<br />

the San Fernando Corridor Redevelopment Plan FEIR for the ten study intersections analyzed<br />

in the FEIR. New counts were conducted at the Flower Street/Grandview Avenue intersection<br />

in January <strong>of</strong> 1996 as part <strong>of</strong> this study. The existing intersection peak hour traffic volumes<br />

are included in Appendix C.<br />

Intersection Level <strong>of</strong> Service Methodology<br />

Level <strong>of</strong> service (LOS) is a qualitative measure used to describe the condition <strong>of</strong> traffic<br />

flow, ranging from excellent conditions at LOS A to overloaded conditions at LOS F. Level<br />

<strong>of</strong> service definitions are included in Tables 9 and 10 on page 72. The <strong>City</strong> <strong>of</strong> <strong>Glendale</strong><br />

considers LOS D to be the minimum acceptable level <strong>of</strong> service.<br />

In accordance with <strong>City</strong> <strong>of</strong> <strong>Glendale</strong> procedures, the "Intersection Capacity Utilization II<br />

(lCU) method <strong>of</strong> intersection capacity analysis was used to determine the intersection volume<br />

to capacity (VIC) ratio and corresponding LOS for the turning movements and intersection<br />

characteristics at the study intersections controlled by traffic signals. A capacity value <strong>of</strong> 1,600<br />

vehicles per hour per lane was used, with a clearance interval <strong>of</strong> 0.1.<br />

"<br />

The intersection <strong>of</strong> Flower Street/Grandview Avenue is controlled by stop signs on all<br />

approaches. The "All-Way Stop Control" method (Transportation Research Board, 1994) was<br />

employed to detennine the average vehicular delay and corresponding level <strong>of</strong> service for this<br />

location.<br />

Planning Consultants Re5earch<br />

<strong>Glendale</strong> Redevelopment Agen9'<br />

Page 71<br />

DreamWork5 Animation Campus Addendum ElR<br />

June 1996

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!