PROJECT IMPACTS<br />

4. 12. 5. Solid Waste<br />

Upon completion, the DreamWorks Animation Campus would include approximately<br />

1,400 employees. Using employee based solid waste generation rates found in the Program<br />

EIR, the proposed project would generate approximately 42,700 pounds <strong>of</strong> solid waste per day.<br />

As with the Redevelopment Plan, the project's potentially adverse effects, when considered<br />

alone, would be below the significance threshold with the implementation <strong>of</strong> AB 939 and with<br />

the utilization <strong>of</strong> the mitigation measures described in the Program EIR.<br />

Although solid waste generation for the project is for the most part included in the<br />

Redevelopment Area generation projections, the increment <strong>of</strong> solid waste generation attributable<br />

to the difference between the project, as proposed, and average Restricted Industrial density<br />

assumptions in the Program EIR is also identified for comparison with the Redevelopment Plan<br />

as a whole. Solid waste generation <strong>of</strong> a theoretical project on the original 12.21 acre (per<br />

County Assessor's records) site using the average Restricted Industrial use floor area ratio, as<br />

identified in Section 2, Project Overview, <strong>of</strong> this document would be approximately 34,029<br />

pounds per day, or 8,671 pounds per day less than the proposed project. Compared with the<br />

1,094,000 pounds per day <strong>of</strong> solid waste projected for existing and proposed Redevelopment<br />

Plan development, the project increment represents an insignificant 0.08 percent increase in<br />

overall solid waste generation.<br />

MITIGATION MEASURES<br />

The following mitigation measures were identified for this issue in the Program EIR, and<br />

may be applicable to this project to meet the goals <strong>of</strong> AB 939. 98<br />

1. The Developer/Participant will incorporate applicable measures <strong>of</strong> the <strong>City</strong>'s<br />

Source-Reduction and Recycling Element in project approvals including:<br />

• The project shall submit a Recycling Plan. The Plan shall include the following<br />

elements: A site plan <strong>of</strong> the proposed area shall identify location(s) <strong>of</strong> the<br />

recycling enclosure(s) relative to the facility or complex.<br />

• Identify all materials to be collected and recycled.<br />

98 Program EIR, Final E1R Volume, pages 3.12-16 and 3.12-17.<br />

Planning ConsulcanlS Research<br />

<strong>Glendale</strong> Redevelopment Agency<br />

Page 112<br />

DreamWorks Animation Campm Addendmn EIR<br />

June 1996