17.06.2013 Views

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

UBLIC HEARING: Director of Development ... - City of Glendale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F. I§ 206] <strong>City</strong> Approval <strong>of</strong> Plans. Drawings and Related Documents<br />

As referred to in § 205 <strong>of</strong> this Agreement, <strong>City</strong> shall have the right <strong>of</strong> review <strong>of</strong> all<br />

plans, drawings and related documents for the development <strong>of</strong> the Site. <strong>City</strong> shall reasonably<br />

approve or disapprove such plans, drawings, and related documents referred to in this<br />

Agreemem (and any proposed changes therein) within the times established in the Schedule <strong>of</strong><br />

Performance. Sufficient plan checkers shall be provided to check construction plans. If<br />

requested by Participant, the plans shall be checked on an expedited basis, at the standard plan<br />

check fee rates. An in-house lead plan checker, and additional plan checkers and outside<br />

consultams as needed, shall be assigned to this Project to give prompt attemion and make<br />

decisions to maimain the schedule and to provide consistency during design and final drawing<br />

submittals through construction. The Ciry Project Manager shall hold coordination meetings<br />

between the plan checkers and field inspectors, at the plan check stage, to minimize field<br />

inspection corrections due to design related code requirements. To eliminate conflicts or<br />

interpretations during construction, the approved plans shall be binding and not subject to<br />

interpretation during inspections unless required for fire or life safety reasons. <strong>City</strong> agrees that<br />

the Project shall be plan checked and inspected based on the codes and regulations that are in<br />

effect as <strong>of</strong> the Effective Date <strong>of</strong> this Agreement. All reviews and approvals shall be processed<br />

by <strong>City</strong> within a reasonably expeditious time (not longer than ten (lO) working days following<br />

each submission by Participant), and Participam shall be charged only standard processing fees<br />

in effect at the time <strong>of</strong> plan submission for such review and approvals. Such approval shall not<br />

unreasonably be withheld or delayed. Any construction drawings and related plans and documents<br />

which are consistent with a logical evolution <strong>of</strong> previously approved basic concept<br />

drawings and related plans and documents, shall not be disapproved by <strong>City</strong>. Any items so<br />

submitted and approved in writing by <strong>City</strong> shall not be subject to subsequent disapproval. Any<br />

disapproval shall state in writing the reasons for disapproval.<br />

Participant upon receipt <strong>of</strong> a disapproval shall revise such pOJ1ions <strong>of</strong> the plans, drawings<br />

or related documents in a manner that satisfies the reasons for disapproval or suggesls alternate<br />

solutions to the reasons for disapproval, and shall resubmit suc.h revised portions to <strong>City</strong> as soon<br />

as possible after receipt <strong>of</strong> the notice <strong>of</strong> disapproval. <strong>City</strong> shall approve or disapprove such<br />

revised portions in the same manner and within the same times as provided in this § 206 for<br />

approval or disapproval <strong>of</strong> plans, drawings, and related documents initially submitted to CilY.<br />

Any inspection or approval <strong>of</strong> plans, specifications and drawings made or granted<br />

pursuant to this Agreement shall not constitute an inspection or approval <strong>of</strong> the quality,<br />

adequacy, or suitability <strong>of</strong> such plans, specifications or drawings, nor <strong>of</strong> the labor, materials,<br />

services, or equipment to be furnished or supplied in connection with actual construction.<br />

Agency or <strong>City</strong> do not have any right, and hereby expressly disclaim any right, <strong>of</strong> super­<br />

VISion or control over the architects, designers, engineers, contractors or other persons<br />

responsible for the drafting or fonnulation <strong>of</strong> lhe plans, drawings, and related documents <strong>of</strong><br />

Participant.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!